ATTACHMENT B JD BRIDGE CRANE LOAD CELL INVESTIGATION - 4_27_21_REDACTED.PDF
Published: 08/31/2022
Description
HYDROELECTRIC DESIGN CENTER MEMORANDUM FOR RECORD SUBJECT: Bridge Crane Overloading Investigation PURPOSE: The trip was conducted to investigate high load readings on the bridge crane during the Unit 12 turbine lift. DATE ON SITE: Apr...
