RIVER DIVERSION PLAN COMMENTS.PDF
Published: 08/31/2022
Description
? Note on Sheet C-001 that the bedrock surface slopes downward upstream from the existing spillway crest at a gradual slope of approximately 0.5%. As a result, the top of rock at the location of the culverts may be below elevation 940 ft. The e...
