ATTACHMENT A - INSTRUCTIONS-EVALATION CRITERIA-BASIS FOR AWARD-WZ.PDF
Published: 08/31/2022
Description
Attachment A A. INSTRUCTIONS: 1. The Contractor shall submit their quotation in response to the Request for Quotation (RFQ) posting by the date and time specified herein. The quotation shall contain, at a minimum, the information detailed be...
