ASW PIPING RENEWAL SOW.DOC
Published: 09/14/2022
Description
S22_079_52000_RTK_0622_754 WORK ITEM 1: Auxiliary Seawater Piping, Renew 1. SCOPE 1.1 Intent. This work item describes the requirements for the Contractor to renew Auxiliary Seawater (ASW) piping as described in the highlighted sections in drawin...
