VA263-12-B-0223 A00003 01 00 00 GENERAL REQUIREMENTS
Published: 03/12/2012
Description
SECTION 01 00 00GENERAL REQUIREMENTS 1.1 GENERAL INTENTION A. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for the façade ...