RFI ADDITIONAL.DOCX
Published: 02/15/2023
Description
1) Considering the Q&A is requiring the General Contractor to hire a Design Firm (A/E), will the contract be reformulated to be a design-build contract? A: We are no longer requiring “Replace overhead walkway with catwalk that meets OSHA 29 CFR 1910...