FINAL-CAPPER INTEGRATION INSTALL PWS-20230216.DOCX
Published: 02/16/2023
Description
PERFORMANCE WORK STATEMENT (PWS) – Illinois CMOP Conveyor System Integration of a Rotary Capper 1.0 BACKGROUND & INTRODUCTION The Great Lakes Consolidated Mail Out-Patient Pharmacy (GL-CMOP) located at 5th and Roosevelt Building 37 NW, Hines, IL 60...
