ATTACHMENT 19 - DRAWINGS PART-18.PDF
Published: 02/16/2023
Description
1. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS. ANY DISCREPANCIES FOUND SHALL BE REPORTED TO THE ENGINEER. SG53-61-BUS 4160.0 V 0.0 A FUSE-SG53-61-3 S&C SMU-20, 200E 200.0 A CBL-53-XF2 BLDG 53 95.0 ft 1 per phase 3/0 AWG Coppe...
