A04_SOW.DOC
Published: 04/18/2023
Description
PERFORMANCE BASED WORK STATEMENT I. GENERAL INFORMATION A. The EESC Leetown Research Center Fish Health Building has a need to replace (4) inline duct return air fans. The existing fans have numerous problems ie: belt access is limited, squirrel ...
