A.02.17 DRAFT AMMONIA SOW 2022 FINAL-V1.PDF
Published: 05/09/2023
Description
STATEMENT OF WORK (a) Requirement. The Contractor shall furnish all of Washington Aqueduct’s aqua ammonia 19% in accordance with the specifications within this Statement of Work (SOW). Aqua ammonia is used at Washington Aqueduct’s two water treatm...
