DWG-CLINTON ENTRANCE CANOPY-A3.PDF
Published: 05/10/2023
Description
Services to be performed by the contractor: 1. Demolition: A. Remove all exposed screws and aluminum clad panels on I-beams and tubular beams as shown on drawing No: A-1. Mark all panels for same location re-installation. B. Remove all backing mat...
