W9127N24R0001 TRGR DRAFT 100 PERCENT SPECIFICATIONS 5.PDF
Published: 07/21/2023
Description
1. 2. 3. RESULTS OF LOWER PLATFORM TESTING, DAYS 2 (4/22/14) & 3 (4/23/14) ? The assembly of the lower platform was completed per instructions above. ? Minor modifications were required in order to make assembly complete: handrail mounting pi...
