ANNEX B EVAL FACTORS UPS PCOLA.DOCX
Published: 08/25/2023
Description
ANNEX B TECHNICAL ACCEPTABILITY REVIEW Contractor’s technical offer will be assessed based on the RFQ PWS/SOW identified technical requirements. The following will be applied for determination of acceptability: Contractor Designation Number: ____...
