REVISED SOW PAGE 7 DATED 7 JUN 12
Published: 06/08/2012
Description
marking tape one (1) foot above conduit. All wiring and conduit shall be installed in accordance with local regulations and applicable state and local codes. Submersible pump cable shall be securely attached to the drop pipe every ten (10) feet, as i...
