VA262-12-Q-0665 VA262-12-Q-0665_2
Published: 06/08/2012
Description
Contractor shall completely prepare site, furnish labor and materials, and perform work to Replace Trench Covers and Insulate Steam Lines, as required by drawings and specifications. The scope of work includes demolition, removal, steam pipe insulati...
