AMENDMENT #3
Published: 06/12/2012
Description
Amendment No. 3.docx HOSP 168597 AMENDMENT NO. 3 Change to Drawing Sheet M-3.2: Change WATER COIL DETAIL 3 to the detail shown on Sketch MS-1, dated 6-8-12 prepared by Alvine Engineering. Change to Drawing Sheet M-4.2: Change PUMP SCHEDULE t...
