DRAWINGS_PLAN SHEETS BID SET-RR7 MM 4.1 CULVERTS_ REVISED SEPT 2023.PDF
Published: 09/12/2023
Description
RR7 MM4 CULVERTS General Notes: 1. Contractor shall submit a traffic control plan for approval prior to beginning construction, per NMSHTD and the MUTCD. Contractor is responsible for maintaining all traffic control devices and maintaining vehi...
