REDLINE DRAWINGS ELECT FEEDERS AND STREET LIGHTING.PDF
Published: 10/20/2023
Description
3. As- Builts 7 b'Re\\055Feed with new conductors. Install new 1" SCH 80 PVC if needed.\n' b'Change fixture head only. Pole to remain.' b'Panel fed from Panel T1\\0551 located in chiller portion of boiler plant' b'HH' b...
