DRAWINGS - MIDLAND, MI RFP#3341 -2012 STORM SEWER
Published: 07/09/2012
Description
STA. 13+09 RT. remove existing 15" storm sewer remove existing storm manhole install 48" storm manhole install 12' - 18" c76 - iii storm sewer @ 0.22% reconnect existing cb lead and yard basin lead GENERAL NOTES 1. ALL CONSTRUCTION SHALL BE IN ACCORD...
