RFI_RICHMOND IN PLANT (3)
Published: 07/09/2012
Description
Cooper Construction Services Installation of in-plant office RFI-7/9/12 1. Please confirm that a prefabricated system is acceptable. (A) Prefabricated system is required and must supply submittals including specs. 2. Please clarify the level of des...
