SITE VISIT Q&A - 12-R-C003 BASE PAVING IDIQ
Published: 07/11/2012
Description
FA5004-12-R-C003 Base Paving IDIQ Site Visit Questions and Answers Q1. Will the Mullen Pit be available for sub-base gravel, if so will it be the responsibility of the contractor to dragline line or will the gravel be pulled from a stockpile? A1. Ava...