INSTALLATION PATH.PDF
Published: 02/20/2024
Description
Total estimated travel path: approximately 800 ft travel truck to lab with minimum clearance 52? at laboratory doors and one freight elevator. Surfaces are vinyl tiles, concrete, and granite. About 10 turns, pivots, or shifts in direction require...
