01 78 00 TASK ORDER CLOSE OUT REQUIREMENTS
Published: 07/27/2012
Description
SECTION 01 78 00 TASK ORDER CLOSE OUT REQUIREMENTS PART 1 1.1 1.1.1 1.1.1.1 GENERAL INSPECTION Pre-Final Inspection The Contractor shall schedule all work so that the required inspections are complete within the contracted performance period of each ...
