VA263-12-B-0181 M106
Published: 08/10/2012
Description
DAV OFFICE 1B LOUNGE 1 � � STORAGE 1A REMOVE AND REINSTALL CEILING IN AREA OF WORK AS NEEDED FOR THE INSTALLATION OF NEW STEAM AND CONDENSATE PIPING STORAGE 4 PROVIDE 2 HOUR ENCLOSURE AROUND NEW PIPING PASSING THROUGH MECH ROOM BATH 13 � WH MUS...
