VA263-12-B-0181 S3
Published: 08/10/2012
Description
PRECAST FRAMING PLAN NOTES: 1. REFER TO THE GENERAL STRUCTURAL NOTES ON SHEET S1. 2. TOP OF TOPPING SLAB ELEVATION (TSE)=100'-0". 3. TOP OF PRECAST ELEVATION (TPCE)=99'-9". 4. DENOTES TYPICAL SPAN DIRECTION FOR PRECAST, SEE PLAN. 5. POST INSTALLED AN...
