VA786A-12-R-0019 P01 REVISED 01 32 16.16 NETWORK ANALYSIS-BAR CHART SCHEDULE
Published: 08/10/2012
Description
sECTION 01 32 16.16 NETWORK ANALYSIS SYSTEM - (BAR CHART SCHEDULE) 1.1 DESCRIPTION: The Contractor shall develop a bar chart schedule, hereafter called “the schedule� using Microsoft Project software, latest version, and utilizing the work breakd...
