QUESTIONS AND ANSWERS
Published: 08/13/2012
Description
Group I Questions: According to the drawings and specifications, some of the existing factors are the following, The total dimension between the existing culvert and the existing outflow pipe is between 500 to 510 LF (253.45+ 248.67= 502.12 LF). The ...
