FINAL - CROSS CONNECTION STATEMENT OF WORK - ATTACHMENT 1
Published: 08/16/2012
Description
STATEMENT OF WORK CROSS-CONNECTION CONTROL SURVEY RANDOLPH AIR FORCE BASE DATE: 16 Aug 12 INTRODUCTION The contractor shall provide all services and documentation required by this Statement of Work for Joint Base San Antonio (JBSA) Randolph AFB, TX. ...
