SOW WENGER MODULE MOVE- FINAL
Published: 08/17/2012
Description
AFRC/BA DRTC 23 July 2012 AFRC/BA Relocation and Re-installation of Wenger sound modules and library systems Statement of Work SPECIFIC REQUIREMENTS OF WORK REQUIRED 1. Relocate, Modify, and Re-install six (6) Wenger sound modules from 233 N Houston ...
