VA262-12-R-1218 ATTACHMENT 3 GENERAL REQUIREMENTS MULTIPLE FLOOR REPLACEMENT
Published: 08/17/2012
Description
MULTIPLE FLOORING REPLACEMENT AND ACBM ABATEMENT Building 1 SECTION 664-12GENERAL REQUIREMENTS 1.1 GENERAL INTENTION A. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and fur...
