VA256-12-B-1421 SECTION 01 32 16 15 PROJECT SCHEDULE
Published: 08/21/2012
Description
SECTION 01 32 16.15 Project SCHEDULES (Small Projects – Design/Bid/Build) PART 1- GENERAL 1.1 DESCRIPTION: A. The Contractor shall develop a Critical Path Method (CPM) plan and schedule demonstrating fulfillment of the contract requirements (Projec...
