W9123824R0049___SOLICITATION.PDF
Published: 07/18/2024
Description
WATER SUPPLY & HYDRANT LOOP, MAIN GATE, DUGWAY PROVING GROUND, UTAH This design-build (DB) requirement is to design and construct a roughly 9000 ft w ater supply and hydrant loop at the main gate that supplies w ater to facilities 5900 and 5...
