TEMP HANGAR QUESTIONS
Published: 09/04/2012
Description
CAFB Temp Hangar Questions 1. The 24�X38� Elliptical Storm Drain on Plan sheet CU 301 starts at sta 0+00. The plans do not show an end treatment or if the storm drain connects to an existing manhole/inlet or existing pipe. Will this pipe connect ...
