MAIN TRANSFORMER - SOW REVISION AUGUST 2012_1 FINAL
Published: 09/06/2012
Description
SCOPE OF WORK GENERAL: An electrical transformer, located at the Amistad Dam Hydroelectric Station, near Del Rio, Texas, has been taken off-line due to failure. USIBWC desires that this transformer be fully inspected, including but not limited to det...
