PWS 278TH FBTX MFGI RAIL DOWNLOAD SEP 2024.DOCX
Published: 08/22/2024
Description
PERFORMANCE WORK STATEMENT (PWS) FOR 278TH MFGI RAIL DOWNLOAD FORT BLISS TX 1.0 General: 1.1 Scope: The contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary, except as specified in Para...
