B09_ATTACHMENT_14_Q_A_AMENDMENT_004_0004.DOCX
Published: 08/23/2024
Description
140G0124R0022 Amendment 004 Q&A 1. Based on the soil conditions in the geotechnical report, we estimate the design capacity can be achieved at about 28 feet deep. However, from experience, some times weaker soils are encountered, requiring us to dri...
