NI12ERS506PS-CG101
Published: 09/26/2012
Description
1 2 3 4 5 LAKE MICHIGAN US Army Corps of Engineersfi 2 Chicago District NOTES 1. THE FIRST SIX INCHES OF TOPSOIL SHALL BE STRIPPED AND STOCKPILED WITHIN WORKLIMITS. ONCE SUBGRADE HAS BEEN PREPARED IN THE MESIC PRAIRIE, WET PRAIRIE, SAVANNA, AND EMERG...
