J-6_PWM HVAC ADENDUM NOTES LIST.PDF
Published: 12/02/2024
Description
1302899 PWM HVAC UPGRADE PROJECT FAA DRAWING CLARIFICATIONS AND NOTES: 1. G020 - Contractor shall flush out both chilled and hot water systems and refill with appropriate composi on prior to temporary equipment start up. 2. D300-D304 – Contra...
