B08_ATTACHMENT_2_LIHO_CONCRETE_CURB_RAMPS_-_DRAWINGS.PDF
Published: 12/19/2024
Description
GENERAL NOTES: 1. ALL CONSTRUCTION SHALL BE IN CONFORMANCE WITH THESE PLANS, REFERENCED STANDARDS AND SPECIFICATIONS, AND GENERAL CONDITIONS IN THE CONTRACT. 2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINATION OF ALL FINAL QUANTITIES AND METH...
