70Z08525Q1630_SOW.PDF
Published: 12/20/2024
Description
TCTO 58300_TAB_0824_418 WORK ITEM 1: Dual Point Davit, Modify and Replace 1. SCOPE 1.1 Intent. This work item describes the requirements for the Contractor to modify the Allied System Dual Point Davit (DPD) with Split/Individual Con...