FIRE RISER RFI001.DOCX
Published: 01/21/2025
Description
RFI Questions/Answers 1. What date and time is the site visit scheduled? 24 Jan at 1100 hours 1. The pictures provided do not show an isolation control valve. Confirm location, accessibility, and provide a picture of the isolation control valve. T...
