CYPHER_LOCK_INSTALLATION_-D-01_WITHOUT_ATTACHEMENTS
Published: 11/14/2012
Description
ECXXX_60400_JSP_0612_750 WORK ITEM 1: Cipher Lock Installation 1. SCOPE 1.1 Intent. This work item describes the requirements for the Contractor to install the cipher lock at COMM/MEES (02-38-0-C), CIC (02-29-0-C) and LAN Room (1-36-1-Q). 1.2 Governm...
