IFB CONTRACTOR COST ESTIMATE WORKSHEET - BEVERLY NATL CEM - PO NO 804CM3021.XLSX
Published: 04/14/2025
Description
Sheet1 This Division List is copied from: NCA MASTER CONSTRUCTION SPECIFICATIONS (https://www.cfm.va.gov/til/ncaSpec.asp) Lump Sums are required for each Division that will be utilized in this project to total the final lump sum number. If a Divis...
