531-24-104 REPLACE HVAC B23-B45 FINAL DRAWINGS REV 1.PDF
Published: 11/07/2025
Description
A. THE CONTRACTORS SHALL COORDINATE EQUIPMENT AND MATERIAL TRAFFIC AND STORAGE WITH COR. B. ALL UTILITY WORK SHALL BE COORDINATED WITH CIVIL PLANS. C. ALL ASPECTS OF CONTRACTOR STAGING AND CONSTRUCTION PHASING SHALL BE APPROVED BY COR. D. ALL HOS...
