VA245-13-B-0050 A00002 S02 - RFI'S ROUND 2
Published: 03/07/2013
Description
Project # 512A5-13-305 – Halls and Walls Fy-13 Formal RFI’s Round 2 RFI Q7: As for the asbestos abatement, final air sampling. Could you please find out if the final air can be PCM sampling , which can be analyzed on site due to the time frame of...