DRAFT_B2_04.04_SECTOR 11 SEWER CALC 2025-12-15.PDF
Published: 12/19/2025
Description
DRAFT sclay Text Box EXISTING LINAC MAIN 6" AT 0.5% ASSUME HALF FULL (PER SLAC): 116 GPM = 0.26 CFS PROPOSED CRMF FLOW FUTURE UPW (PER MEP): 10 GPM BUILDING (PER MEP): 1GPM COOLING TOWER: (2) 4" AT 0.5% FLOWING FULL: 152 GPM = 0.34 CFS TOTAL: 163 ...
