METER INFORMATION REQUIREMENT.PDF
Published: 12/22/2025
Description
1. The contractor shall verify field conditions for each transformer/ building. 2. All new meter installations shall be provided with voltage, and current safety disconnects and fuses or equivalent, so that the meter assembly can be worked on safely...
