B08_ATTACHMENT_04_PHOTOS_NOCA_SVR_MP8_SOW_ATTACHMENT_A-F.PDF
Published: 03/06/2026
Description
Existing bank barb locations 45 feet eroded bank Base layer 2015 lidar Damaged bank barb A A’ Reference ceder tree Stehekin Valley Road (SVR) Mile Post 8 Existing Conditions 1/21/2026 Attachment A 115 feet eroded bank Stehekin Valley Ro...
