03. W912LP26R0007_ATTACHMENT_2B_ADDENDUM_TO_FAR_52.212-1.PDF
Published: 03/09/2026
Description
Attachment 2b ***Addendum to RFO FAR 52.212-1*** 1.0 PROPOSAL SUBMISSION INSTRUCTIONS 1.1 Submission Due Date. The contractor shall ensure their proposal, in its entirety, reaches the required destination before the date and time set for c...
