KC-46 LGPBL - APPENDIX C - REMANUFACTURING REQUIREMENTS (4-7-2026).PDF
Published: 04/07/2026
Description
Appendix C 1 December 2025 Page 1 Appendix C – Remanufacturing Requirements 1.0 Scope Upon award of this contract, the contractor will assume total responsibility for overseeing remanufacturing operations for the parts contain...
